Yuzhno-sakhalinsk. power station, drilling 500mm with casing pipe driving diam 426mm, lenght 6,8m
NEW equipment!!! Timovskoe. children garden 200 rerson, dynamic method of field testing by piles, concrete piles 30x30, 25x25, lenght 7 and 6 m, 555 each
Shakhtersk. road construction, water tube, concrete piles, dynamic method of field testing by piles, 35x35, lenght 8 m, 69 each
new equipment!!! Sovetskoe. Bridge bearing, concrete component piles, 40x40, lenght 9+8 m, vertical and tilt piles
taranay. dinamic method of field testing by piles. pig-breeding farm.30x30, lenght 8,5 m, total q-ty 192 each
Kholmsk, garage with office. concrete piles 30x30, lenght 4,5 m, 98 each
Yuzhno-Sakhalinsk, warehouse store. concrete piles 30x30, lenght 8,9,10 m, 303 each
Aniva region, Zolotoribnoe vilage. Vegetable store 3500 ton. concrete piles 30x30, lenght 7-8 m, 48 each
Kholmsk. Reconstruction of water storage. Installation of PIPES lenght 40 ft, diam 6,7 inch (12m/170mm). Drilling debth 46ft, diam 11,8inch (14m/300mm). 12 each
Yuzhno-Sakhalinsk. Reconstruction of City ZOO. Installation of timber piles lenght 12 m. with predrilling. 11 each